Challenge A Rushed Contractor Handover

Use CUS language to escalate a concern about incomplete worksite handover evidence.

railway-operations5 min read

Contractor Lead Dev D Track work package C Concerned U Uncomfortable S Safety issue The moment 20 sec Handback pressure The line is due back in 10 minutes. Dev says the worksite is clear, but the ballast profile photo and tamping record are missing from the handback pack. If the evidence is missing, signing does not make the control real. 10 min to handback 2 missing evidence items