Ga naar de hoofdinhoud

Walk the Criticality Screen

Apply a criticality screen that separates consequence, likelihood, and controls.

industrial-asset-management5 min read

Criticality pressure A packaging conveyor is being called critical because it stops Line 2, but the same asset also contains a guarding interlock with a different consequence profile. The label will drive PM rigor, spares, and escalation, so a sloppy label creates either waste or unmanaged risk. IEC 31010 risk screen Function -> consequence -> likelihood -> controls -> treatment A criticality screen works when it keeps these questions separate. Do not let downtime pain, asset price, or recent emotion collapse the analysis. Shortcut Call the whole conveyor critical because it stopped the line. A function-specific class with a next…

Read the full lesson

Sign up free: one personalized lesson every day, matched to your role and goals.

← Back to library

Neem contact op