Ga naar de hoofdinhoud

Batch or Flow: Make the Right Tradeoff

Select a flow improvement that reduces waiting without ignoring real constraints.

lean-manufacturing5 min read

The team has a 6-minute work cycle hidden inside a 28-hour lead time. The decision should reduce waiting at the system level while preserving constraints that are genuinely technical or safety-related.

Read the full lesson

Sign up free: one personalized lesson every day, matched to your role and goals.

← Back to library

Neem contact op