Sort each material into the control intensity it deserves. A control: tight review B control: regular review C control: simple rule $2,700 servo drive, 10-week lead time, stops the bottleneck cell $4 sterile filter, 18-week lead time, no approved substitute $0.06 paint label, stocked by local vendor, easy substitute $140 bearing kit, monthly use, two qualified suppliers Standard cable tie, daily use, low cost, local replenishment $32 custom gasket, stable demand, single-source tooling Printed carton, medium value, promotion demand changes monthly
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in