Ga naar de hoofdinhoud

Sort the Energy Map

Separate energy sources from energy isolating devices and non-isolating controls.

lockout-tagout5 min read

Sort the cards by what they are in a LOTO energy map. Energy source Energy isolating device Not isolation Hydraulic pressure source Lockable disconnect switch isolating-device Start button not-isolation Lockable line valve Gravity from raised ram Mode selector switch energy mapping You separated physical isolation from operating controls. Ask: does this device physically prevent energy transmission, or does it merely request the machine to behave?

Read the full lesson

Sign up free: one personalized lesson every day, matched to your role and goals.

← Back to library

Neem contact op