The crunch Six fermenters full, two brights occupied, Monday packaging fixed, and the brewhouse ready to knock out another 30 bbl. If the team keeps every department locally busy, it may reduce total beer shipped. Constraint-first scheduling Find the limiting point before moving work The question is not which task is urgent in isolation. It is which point limits the whole brewery's ability to ship good beer. Weak reflex Ask every area to hurry equally Fewer heroic moves, more shipped beer. A busy non-constraint can make the constraint worse. 01 Find 02 Exploit 03 Try Find the constraint Step 1
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in