Sort each forestry safety intervention by the most fitting level in the hierarchy of controls. Elimination Substitution Engineering control Administrative control PPE Cancel hand-felling in a snag patch and leave it as a no-entry reserve Use mechanical processing instead of saw work in a blowdown tangle Install temporary barrier tape and machine exclusion around the drop zone Set a 90-minute heat rotation and buddy-check schedule Wear chainsaw chaps, helmet, visor, hearing protection, and gloves Move the landing so trucks do not back near the public trail Use a drone inspection instead of sending a person under unstable crowns Place water…
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in