Flow problem The morning check-in line is backing up, but the team only has anecdotes about why. Process changes stick when they are tested, measured, and adjusted. Model for Improvement Aim -> Measure -> Change -> PDSA Define what better means before you run the test, then study what happened. Big rollout Tempting when the pain is visible. The practice learns before it standardizes. Improvement is a learning cycle, not a one-time announcement. 01 Aim 02 Test 03 Study Name the aim Specific
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in