Use a documented change-order approval script before changed solar work begins field condition that affects cost, schedule, warranty, visual layout, or contract scope For the next scope-impacting field condition by [date], I will send a message that includes: observed condition, original scope assumption, options with cost/schedule impact, and written approval request. I will upload the approval to the job record before authorizing changed work. Unexpected trench hardscape discovered while the crew is onsite and rental equipment is time-sensitive Roof decking or tile condition requires repair before array installation can continue Main-panel constraint requires a service upgrade or alternate design before…
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in