Saltar al contenido principal

Sort Bow-Tie Controls for a Crane Lift

Classify bow-tie elements for a high-risk crane lift.

ports-terminals-management4 min read

Sort each item by its bow-tie role for the top event: loss of control during a heavy crane lift. Threat Preventive barrier Recovery barrier Consequence Rising crosswind gusts during the lift window Truck lane operating beside the lift zone Physical exclusion zone with a named spotter Approved lift plan and pre-lift briefing Emergency stop and incident call-out procedure Rescue access kept clear during the lift Worker injury from dropped or swinging load Damage to crane, cargo, or adjacent equipment

Read the full lesson

Sign up free: one personalized lesson every day, matched to your role and goals.

← Back to library

Contáctanos