Sort each control by its place in the Hierarchy of Controls. Elimination Substitution Engineering control Administrative control Personal protective equipment Resequence overhead cutting to a closed corridor with no pedestrian exposure Cancel the lift over occupied workspace by prefabricating assembly offsite Use a lighter preassembled module instead of field-assembling heavy pieces Use wet-cutting method to reduce silica dust during wall penetrations Install hard barricade and overhead protection deck below cutting zone Use guardrails around the floor opening before material handling begins Assign a spotter and issue a permit for temporary corridor closure Add signage and a pre-task briefing about overhead…