Aller au contenu principal

The Mitigation Commitment Walk

Use FMEA-style thinking to convert mitigation promises into verifiable permit commitments.

environmental-permitting5 min read

Vague condition The permit says to minimize turbidity, but the field team needs to know what to do when water conditions change. A vague mitigation promise can fail even when everyone supports it. FMEA for mitigation Ask how the commitment could fail Convert each mitigation promise into failure mode, effect, control, monitoring, and response. Promise Minimize turbidity during work. The condition becomes usable in the field. A mitigation measure without a failure response is only an intention. 01 Failure 02 Control 03 Evidence 04 Now try

Read the full lesson

Sign up free: one personalized lesson every day, matched to your role and goals.

← Back to library

Nous contacter