Sequence OSCS What is the SMED improvement sequence? Observe, then redesign the stop window Internal vs external Which side of shutdown does the work belong on? SMED improves availability by moving anything external out of the stopped window. Objection We need a new fixture before this changeover can improve. A technically skilled team wants to start with hardware. Your line Maybe. First let us list the elements and move the preparation work out of stop time. If the remaining internal element still justifies a fixture, the business case will be cleaner. Jumping to capital before seeing low-cost human and sequence…
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in