Aller au contenu principal

Use PDCA to Keep Controls Alive

Apply Plan-Do-Check-Act to an occupational health and safety control.

safety-management5 min read

Which action is the Check step in PDCA? Selecting a mirror to reduce blind-corner collisions Installing the mirror and briefing forklift drivers Observing whether stacked pallets block the mirror during peak loading Changing the staging rule after the observation shows a blockage pattern Check is the evidence step: it tests whether the implemented control works under real operating conditions.

Read the full lesson

Sign up free: one personalized lesson every day, matched to your role and goals.

← Back to library

Nous contacter