Aller au contenu principal

Sort Workflow Waste in Solar Ops

Classify solar workflow issues as muda, mura, or muri so the fix matches the problem.

solar-installation-business5 min read

Sort each solar workflow issue into the Lean Three M category that best explains it. Muda is waste, mura is unevenness, and muri is overburden. Muda Mura Muri Crew drives back to the warehouse because the job kit missed two roof attachments Eight permit approvals are released to install on Friday after three quiet days Two installers carry heavy batteries upstairs without lift equipment or extra help Designer re-enters utility data already captured in the sales CRM Sales closes jobs in end-of-month spikes that overload survey the following week Crew lead is expected to install, train two new hires, and…

Read the full lesson

Sign up free: one personalized lesson every day, matched to your role and goals.

← Back to library

Nous contacter