Recovery cost Business urgency Low cost High cost Low urgency High urgency Do narrow High urgency, low recovery cost Handle the smallest unblocker now, then close the boundary again. Example: one answer that lets a teammate finish. tl Negotiate support High urgency, high recovery cost Do not absorb alone. Narrow scope, add backup, or trade tomorrow's work. Example: Sev1 response during a protected family window. tr Batch later Low urgency, low recovery cost Put it into a normal work block. Example: a quick approval that can wait for the morning admin batch. bl
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in