Classify MRB tasks into responsible, accountable, consulted, and informed roles to reduce disposition confusion.
Place each MRB activity into the correct RACI role for this nonconforming bracket. Responsible Accountable Consulted Informed Manufacturing engineer drafts the proposed repair method and required verification steps. Design authority approves whether use-as-is meets fit, form, function, and safety intent. Quality engineer verifies containment, record completeness, and disposition process compliance. Customer representative gives required input when contract flowdown requires customer MRB involvement. Program manager receives ship-impact status after the technical disposition path is known. Operator explains how the condition was found and whether adjacent parts may be affected. MRB chair signs the final disposition package after required technical approvals are…