Sort: What Kind of Control Does This Signal Need?

Classify project signals by the management control they require.

Place each project signal in the control bucket it most needs right now. Scope / change control Risk / owner and trigger Quality / defect loop Schedule / critical path Client asks for a second facade option after the approved concept route. Planning officer may require an ecology survey, but the requirement is not confirmed. Door tags and the schedule disagree across three sheets. Drainage strategy must be complete before roof drawings can freeze. Client adds an operator workshop not listed in the appointment. Repeated stale notes appear because the team reused an old template. Fire consultant response may change…