Skip to main content
CONSTRUCTION-MANAGEMENT5 MIN READ

Sort the Change Event Before It Becomes a Claim

Categorize construction change events by the control path they require.

Sort each field event into the first control path it needs. RFI clarification Field directive Change notice Substitution request Formal change order Detail 6/A504 conflicts with the approved millwork shop drawing at reception Engineer asks whether beam sleeve can shift three inches around rebar congestion Owner representative instructs contractor to open the finished wall immediately Inspector requires temporary shoring before excavation remains open overnight Unknown concrete obstruction discovered where drawings showed clear soil Owner decision on lab casework is five days late and may affect sequence Supplier proposes alternate air terminal because approved model is discontinued Plumber requests alternate valve…

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us