Run a Small PDCA Event Pilot
Design a small PDCA test for a coworking event or operations routine.
Tuesday breakfast attendance is low, and the team is debating cancellation versus heavy promotion. Plan a narrow test, Do it at limited scale, Check against the prediction, then Act based on evidence. Changing several variables at once makes the result impossible to read; the team learns that "breakfast worked" or "breakfast failed" without knowing why. Plan Prediction: moving founder breakfast to 8:30 and adding a fundraising prompt will raise attendance to 12 and produce eight useful introductions. The plan names audience, change, and measures before the test. Do Run two Tuesdays only, cap food at 12, and invite members who…
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in