Electrical Fire Loads Hide in Plain Sight
Choose a stronger control for electrical fire load in a temporary workspace.
A team adds a power strip to support monitors, chargers, and a small heater at a temporary workstation. What is the strongest response? Remove the heater and review the temporary workstation load with facilities before use Tell the team not to run everything at the same time, but allow the setup today Add a second power strip so the load is spread across more outlets Keep the setup because temporary workstations are exempt from normal review Correct: Remove the high-risk load and get competent review before use. The other options are weaker because they violate sequence, control reliability, or exposure…