Skip to main content
ENVIRONMENTAL-PERMITTING5 MIN READ

Sort the Risk Treatment

Match permitting risks to avoid, reduce, transfer, accept, or monitor treatments.

Sort each permitting risk by the treatment move that best fits. Avoid Reduce Transfer Accept Monitor Laydown area overlaps floodplain when an upland parcel is available Wetland impact can drop below a threshold by narrowing the access road Agency uncertainty about survey protocol can be clarified in a pre-application call Public concern about haul timing can be reduced with a school pickup analysis Contractor must maintain BMPs under a construction contract Specialist consultant must complete species survey under defined scope and schedule Minor permit fee increase is below contingency and does not affect authorization path A low-probability comment extension is…

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us