Create a pre-install moisture check that uses PDCA and control hierarchy logic.
A lead installer is standing on a slab that failed the moisture limit, with product staged and the customer pushing to keep the date. PDCA turns the moisture check into a repeatable system: plan the stop point, do the reading, check it against the actual product limit, and act with approved controls. The common shortcut is treating a close reading as a judgment call because the schedule is painful. That converts a technical control into a personality test. Documented go/no-go standard A written preflight makes the hard decision earlier, cheaper, and more defensible for the customer, crew, and warranty. Before…
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in