Skip to main content
GOLF-COURSE-MANAGEMENT4 MIN READ

Sort Board Cards By Flow State

Classify maintenance work by Kanban flow state to improve visibility and follow-through.

Sort each maintenance card into the Kanban state that best reflects reality. To Do Doing Blocked Done Bunker 4 drainage inspection planned for after morning setup Tech is currently replacing the broken head on 6 fairway Pump alarm waiting on vendor callback before reset Cart-path-only signs placed and shop notified Range net repair cannot start until replacement cable arrives Forward tee leveling approved but not started Certified operator is cutting the limb on 3 Cup locations checked against pin sheet and starter has copy

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us