Sort the Handoff Roles

Classify handoff statements into RACI roles so project authority stays clear.

Sort each statement into the RACI role it describes. Responsible Accountable Consulted Informed Contractor installs the blocking and confirms field dimensions Designer prepares two compliant tile substitution options Design lead makes the final call on whether the reveal preserves design intent Client approves any substitution that changes budget or visible design direction Millworker advises whether the preferred detail can be fabricated cleanly Electrician confirms whether the sconce location works with existing wiring Client receives a note that the equal-cost backordered item was replaced with the approved alternate Procurement coordinator is copied after the install date changes