Apply a PDCA sequence to stabilize a route disruption without hiding the learning.
Route disruption A closure cuts Route 6 in half. Four parcels have before-3 p.m. promises and the driver is already 20 minutes off sequence. The team needs a fast recovery without losing the learning. PDCA in a live route Plan small, do visibly, check quickly, act permanently Use PDCA as a short operating loop, not a post-mortem ceremony. Shortcut Move stops randomly and explain later. A cleaner recovery and a reusable operating rule. Stabilize the customer risk now, then preserve the learning. 01 Plan 02 Do 03 Check 04 Now try
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in