LEAN-MANUFACTURING5 MIN READ
Pull the Work, Do Not Push the Forecast
Choose a pull signal that authorizes production based on downstream consumption.
The plant has a utilization reflex: make more of what is easy when demand is uncertain. Pull logic asks what downstream actually consumed and authorizes only replenishment of that need.
Read the full lesson
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in