Skip to main content
LEAN-MANUFACTURING5 MIN READ

Update Standard Work Without Starting a Fight

Use standard-work dialogue to align shifts around a tested method.

Rosa R Night shift lead 1 Frame 2 Test 3 Standardize Shift conflict 20 sec Two methods Night shift loads trays diagonally and finishes faster. Day shift says the diagonal load scratches painted parts. Both teams think the other is ignoring reality. The next conversation decides whether standard work feels like learning or control. 11s night shift time saved 4% scratch claims on painted parts

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us