Use MoSCoW to classify 5G pilot requirements by decision-criticality.
Sort requirements for a 10-week 5G dock-stoppage pilot. Must have for the pilot decision Should have if effort allows Could have as a low-cost enhancement Will not have in this pilot Baseline stoppage minutes by shift before install Reliable coverage in the one loading dock test zone Timestamped alert log tied to stoppage events Named asset and incident owner for connected devices Short supervisor trust survey after each week Measure time to onboard an extra device Executive dashboard with custom branding Roll out the same design to every warehouse