Skip to main content
AUTOMOTIVE-MANUFACTURING5 MIN READ

PDCA the Process Change

Use PDCA to test and standardize a manufacturing process change.

Torque change The socket looks promising, but the team has not checked safety, cycle time, or repeatability. PDCA protects the plant from scaling hope. PDCA path Plan -> Do -> Check -> Act A small learning loop beats a big unverified rollout. Scale only what the Check step supports. Plan Hypothesis The team believes the new socket will reduce cross-threading. What makes the Plan step strong? Do and Check Pilot The first trial reduces defects but creates wrist strain for one operator. How should Nadia respond? Act Standardize The second trial hits the defect, cycle-time, and ergonomic targets.

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us