CI-CD-FUNDAMENTALS5 MIN READ
Discuss a manual production gate
Negotiate a production approval gate that matches risk and preserves flow.
Ravi RA Operations manager 1 Find risk 2 Match control 3 Define evidence Gate request 20 sec After a rollback, Operations wants required manual approval on every production deploy. The request is a signal. The job is to identify the risk and fit the control to it. recent rollback All deploys affected if blanket gate lands Risk-fit gates 1 min
Read the full lesson
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in