Sequence a basic pre-pour check so hidden concrete defects are caught before placement.
Truck en route A slab pour is about to start. Rebar is placed, anchor bolts are templated, and the crew is pushing to keep the truck on schedule. After placement, the most important evidence is buried. Pre-pour sequence Check what concrete will hide A pre-pour check is a sequence, not a glance. Start with geometry, then reinforcement, cover, embeds, cleanliness, and placement readiness. Glance Looks ready from the edge The pour starts with the buried work already verified. Prioritize items that become hidden, irreversible, or expensive after concrete is placed. 01 Geometry 02 Steel 03 Embeds 04 Fresh case