Use vulnerability and adaptive-capacity language to engage operations on physical climate risk.
Luis L Warehouse VP 1 Respect 2 Diagnose 3 Trigger Operations resistance 20 sec The moment Luis says the business continuity plan already covers outages and heat interruptions. Last July's records show 31 lost labor hours and two power dips. The risk conversation must improve the plan without implying operations has been careless. 31h heat-protocol labor loss power dips during peak week 0
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in