Skip to main content
DIALYSIS-CENTER-MANAGEMENT5 MIN READ

Run a one-pod turnover PDSA

Design a small PDSA test with a prediction, measure, observation plan, and next action.

Pod C turnover averages 18 minutes, delaying second-shift starts and increasing lobby pressure. PDSA: Plan the test, Do it small, Study against the prediction, Act on what you learned. Rolling out a center-wide turnover rule before learning whether the proposed change works in one pod. Plan Test a pre-staged turnover cart in Pod C for one morning. Predict median turnover will fall from 18 to 13 minutes. The prediction makes the test falsifiable, and one pod keeps the risk small. Do Assign Tara to stock the cart at 5:30 a.m. and Marco to record patient-off and station-ready times. A PDSA…

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us