Classify common engineering package roles into RACI categories to clarify ownership.
Sort each drawing-package statement into its RACI role. Responsible Accountable Consulted Informed CAD designer updates the sheet backgrounds and title blocks Mechanical lead signs off that the equipment schedule is technically correct Electrical lead provides input on power requirements before equipment is finalized Client project manager receives the issued package and decision log PM confirms the package meets the promised submission scope Fire protection engineer reviews sprinkler clearance around ceiling devices Project coordinator uploads the final files to the client portal Principal receives a summary after the package is submitted