Keep RAID logs from becoming junk drawers
Classify project statements as risks, assumptions, issues, or decisions so the next action is clear.
Sort each statement into the RAID category that determines the next action. Risk Assumption Issue Decision The city may require an additional traffic study after first review We are designing around a 12-foot service lane until facilities confirms truck access The geotech report is three days late and blocking foundation design Client selected mechanical Option B in the June 14 meeting Utility provider response might miss the permit package date The team assumes the owner will provide shutdown access on Saturday Architectural grid changed after structural calculations were issued for review PM approved moving the survey coordination meeting to Wednesday
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in