Handoff a tight-access install
Transfer access, hazard, and control details from estimate to crew plan before a tight-access job starts.
The handoff gap The estimate captured a tight side gate, but the crew packet only lists footage and material. The crew cannot control a condition they do not know exists. JSA handoff Step, hazard, control A crew packet should translate site observations into work controls. Material-only packet 96 ft vinyl, start Monday. Crew loads and stages correctly. The handoff is where the estimate becomes a work plan. 01 Capture 02 Control 03 Confirm Capture the access condition Estimator note