Walk the Hot-Work Stop Decision
Use a decision path to stop hot work when fuel, route, or response readiness is not controlled.
Small grind, real sparks A contractor wants to grind a bracket near packaging scrap. The route is narrowed and the extinguisher is behind a tool chest. The job duration is not the risk measure; the spark path and route control are. Framework Hot-work gates Use the fire triangle to remove fuel from heat. Use evacuation-route checks and PASS gates to make sure response remains possible. Shortcut It is only two minutes Proceed only when all gates hold. Stop work when a gate fails; correct the condition before sparks start. 01 Fuel 02 Route 03 Response Fuel gate Fire triangle
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in