OEE-IMPROVEMENT5 MIN READ
Sort the Six Big Losses Into the Right OEE Factor
Classify common manufacturing losses under the correct OEE factor.
Place each loss reason into the OEE factor it primarily affects. Availability Loss Performance Loss Quality Loss Hydraulic fault stops the press for 24 minutes Flavor change takes 58 minutes from last good to first good Photo-eye reset pauses the case packer for 25 seconds at a time Line runs at 82 units/minute against a 100 unit/minute ideal rate Stable run produces leaking seals that require rework First 80 units after warmup are scrapped Constraint stops because downstream pallet lane is full Worn guide rail causes repeat hesitation while still running
Read the full lesson
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in