SBAR shift handover pocket deck
Use SBAR to structure a plant shift handover under time pressure.
SBAR What does SBAR force into a shift handover? Reveal the four handover prompts Which handover line is stronger? Strong handovers name the condition and the next action. We do not have time for a formal handover. A supervisor wants to skip structure because the shift is already late leaving. You say SBAR is the shortcut: four prompts, the current risk, and the next action. It prevents the next crew from rediscovering the same problem. Do not sell SBAR as paperwork. It frames structure as speed and risk control. What belongs in Recommendation? The specific action, owner, and timing the…