Skip to main content
PRODUCTION-PLANNING5 MIN READ

Defend a Leveled Sequence With the Shop Floor

Use heijunka logic to discuss a mixed production sequence with a supervisor who prefers batching.

Ben B Shift supervisor 01 Respect 02 Explain 03 Adapt Sequence pushback 20 sec The objection Ben wants to batch Model A because mixed sequencing increases changeovers. The planner must keep the line runnable without causing downstream unevenness. 5 changeovers in mixed sequence 2 customer families due tomorrow

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us