PRODUCTION-PLANNING5 MIN READ
Fix the MRP Input Before Expediting Parts
Diagnose an MRP shortage by checking the master schedule, BOM, inventory status, and lead-time assumptions before expediting.
The visible problem is a Friday shortage. The planning problem is whether the shortage is true after the engineering change, BOM effectivity, inventory record, and open order data are checked.