Classify production losses into OEE categories so the schedule response fits the real constraint.
Drag each production loss to the OEE category it belongs to. Availability loss Performance loss Quality loss The filler was scheduled to run but stopped for 62 minutes after a pump fault The line started late because the certified setup operator was not available A planned sanitation stop took 45 minutes longer than the schedule assumed The capper ran all shift but stopped for short jams every six minutes Operators ran at 70% of standard speed to avoid vibration after maintenance Packaging waited repeatedly because upstream trays arrived in small uneven bursts The first 180 units after changeover failed seal…
Sign up free — one personalized lesson every day, matched to your role and goals.