ROOT-CAUSE-ANALYSIS5 MIN READ
Use FMEA before the next failure
Choose FMEA when the team needs to prioritize potential failure modes, effects, and controls.
A vendor-import near miss exposed one actual malformed field and several credible future failures in adjacent import paths. The team must decide whether to stop at the patch or widen into risk prevention.
Read the full lesson
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in