Claims demand is 35 items per hour from 8 to 10 a.m., 80 per hour from 10 a.m. to 1 p.m., and 30 per hour after 3 p.m. Heijunka-style load leveling for schedule design The common trap is to solve a narrow peak with a full-day staffing increase. That raises cost in quiet windows and may still leave breaks in the wrong place. Locate the peak Demand more than doubles between 10 a.m. and 1 p.m. The schedule problem is concentrated, not all-day. Compare capacity by hour The current roster has six people at 8 a.m., six at 10 a.m.,…