Choose a release-gate action based on predefined quality evidence rather than schedule pressure.
Gate: zero critical defects and at least 90% automated regression pass. Current evidence: zero critical defects, 87% regression pass, one failed test in a low-volume admin path, launch pressure is high.
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in