Skip to main content
ENERGY-UTILITIES-OPERATIONS5 MIN READ

Quick Reference For Management Of Change

Recall the MOC checks that make operational changes visible and controlled.

Five checks BASIS What five checks should a utility MOC request pass? Think BASIS. Classification Replacement-in-kind or MOC? Classify by changed assumptions, not by how easy the change is to type. Temporary tweak It is only temporary, so we do not need MOC. A weekend setpoint change request. Your line Temporary changes still change risk. What is the basis, safeguard, approver, expiry, and rollback trigger? Temporary changes often become invisible because everyone assumes someone else will remove them. It softens the refusal while requiring control. Rollback What makes a rollback trigger useful? It is observable, time-bound, owned, and tied to…

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us