Walk the Interconnection Bottleneck

Choose a least-regret response when interconnection constraints threaten a renewable project.

The bottleneck A 1.8 MW solar design hits a 1.1 MW feeder limit unless the site funds an upgrade. The team needs one objective and comparable options, not three separate reactions. Risk plus optimization Constrain the options before choosing the option Treat interconnection as a constraint to model and a risk to manage. Then compare treatments against the same objective. React Wait, shrink, or argue The decision becomes comparable and governable. Good renewable management turns constraints into option design. 01 Define 02 Model 03 Choose same objective Finance, operations, and the developer each prefer a different response.