Skip to main content
ENERGY-UTILITIES-OPERATIONS5 MIN READ

Run A PDSA After A Checklist Miss

Use PDSA to improve an operations checklist after a missed verification step.

A lockout checklist was signed before the field crew physically verified the tag on the device. PDSA: Plan a theory, Do a small test, Study the result, Act on what was learned The common trap is sending a reminder or adding more checklist boxes without testing whether the change targets the actual failure mode. Plan Theory: the signature box appears before the physical verification cue, so people experience the checklist as complete too early. A good plan predicts a mechanism, not just a desired behavior. Do Test one revised checklist in two drills: move physical tag confirmation directly before signature…

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us