Use a premortem sequence to convert imagined failure into preventive action.
The quiet risk A 600-person summit depends on a live demo with one unstable integration. Everyone wants momentum, but several people are carrying private concerns. A premortem makes hidden risk speakable before it becomes expensive. Premortem sequence Future failure -> present prevention A premortem temporarily assumes failure happened, then harvests plausible causes and converts them into design changes. Reflex Ask, "Are we good?" and hear polite silence. Risk becomes design input. Dissent needs a job to do. 01 Frame 02 Harvest 03 Mitigate 04 Now you try
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in